Project Information
Piping Works:
- Prefabrication and installation of a total of 1,100 m of pipelines
- Diameter: Up to DN500
- Materials: P235, 1.4301, 1.4404
- Including valves and supports
Steel Construction:
- Fabrication and installation of 85 tons of steel structures
Equipment:
- Installation of 160 tons of equipment
- Installation of conveyor systems
Project Information:
- Project Duration: 12 Months
- Engineering: 4 Engineers
- Fabrication & Installation: 25 Employees
- Project Status: Project Completed